Page 1 of 1

Lead Rack Placement for Live Shows

Posted: 07 Jan 2018, 22:38
by ericL
I'm finally integrating my NL2XR into my live rig. I have an option to put it into a 4-space rack that would be a second rack for me. It feels like a bit of a waste to tuck all those knobs out of reach and I was thinking about either an angled case or setting up the Lead Rack on a stand to be able to get to the controls in real time.

I was wondering if anyone uses their Leads outside of a rack and if so, how are you setting it up around other gear and also transporting it?

Thanks!

Re: Lead Rack Placement for Live Shows

Posted: 08 Jan 2018, 22:34
by skintechnician
Hello,

I just bought a Nord Rack 2x as well. I’m not planning on using it live but picked up a Moog multi-purpose gig bag that fits well for transporting (also can fit the Arturia KeyStep inside too).

Good luck!

Nate

Re: Lead Rack Placement for Live Shows

Posted: 09 Jan 2018, 06:17
by Quai34
Hi,
Just did a litle drawing on how I did it with my current rack:
https://www.dropbox.com/s/6as980npnnvi6 ... L.pdf?dl=0
Rack 2X for EricL.pdf
(171.87 KiB) Downloaded 159 times

Re: Lead Rack Placement for Live Shows

Posted: 09 Jan 2018, 07:36
by ericL
Very cool! Thanks.

Re: Lead Rack Placement for Live Shows

Posted: 10 Jan 2018, 01:33
by Quai34
You're welcome, just let me know what solution you end up with...
Sincerely